Advanced House Construction BOQ & Cost Calculator
Detailed estimation from foundation to finishing — quantities, cement bags, sand/crush CFT, steel kg/tons, bricks/blocks, labour and PKR cost.
1. Project & General Inputs
Quantities are estimating formulas. Final RCC and reinforcement quantities must be checked against architectural/structural drawings.
2. Material & Labour Rates — PKR
3. Detailed Construction Elements
Foundation & Excavation
EarthworkFootings
RCCColumns
RCCBeams
RCCSlab
RCCBrick / Block Masonry
MasonryPlaster & Finishing
FinishingFlooring, Electrical, Plumbing & Paint
Finishing4. Project Summary
Area / Floor0
Total Built-up Area0
Total MaterialPKR 0
Total LabourPKR 0
Grand TotalPKR 0
5. Detailed BOQ
| Element | Quantity | Unit | Material | Labour | Total |
|---|
6. Professional Material Summary
| Material | Quantity | Unit | Estimated Cost |
|---|
7. Calculation Notes
Cement consumption is converted to bags using approximately 50 kg/bag. Steel is shown in kg and tons. RCC concrete uses approximate cement/sand/crush consumption factors suitable for preliminary budgeting. Brick/block counts depend on actual size and mortar joint. Electrical, plumbing, doors and windows are allowance-based. Market rates should be updated by the user before relying on the estimate.